KTX Component Replacement Cycle Shortened from 15 to 5 Years

The government is reducing the replacement cycle for KTX train electrical components from 15 years to 5 years to prevent sudden emergency braking. Additionally, approximately 16,000 aging wooden rail sleepers installed across the national railway system will be replaced by the end of the year. The Ministry of Land, Infrastructure and Transport plans to enhance vehicle and facility inspections and preventive maintenance to reduce recurring railway accidents and service disruptions.


On November 16, the Ministry held the "4th Railway Safety Meeting" at the Government Sejong Complex, attended by officials from Korea Railroad Corporation (KORAIL), the National Railway Authority, and private experts to review the implementation of measures to prevent major accidents.


According to the Ministry, railway accidents decreased from 82 in 2022 to 68 in 2023, 46 in 2024, and 42 last year. As of October this year, there have been 25 incidents. While the trend shows a decline in accidents, similar incidents and service disruptions continue to occur, prompting a focused review of the implementation of existing safety measures and additional improvements.


The Ministry analyzed the causes of 15 major railway accidents and service disruptions that occurred in the second half of this year and reviewed preventive measures. In the area of railway vehicles, inspections have been completed for 11 KTX trains using the same power transmission device related to a malfunction.


Efforts will also be made to replace aging components and improve maintenance methods to prevent failures in braking and electrical control systems. Specifically, the replacement cycle for the relay device, which is an electrical component related to sudden emergency braking in KTX-Sancheon trains, has been shortened from 15 years to 5 years. Preventive measures have been implemented, including the proactive replacement of 10 switches that detect air pressure in the braking system.


In the area of railway facilities, following the derailment incident at Busan Station, inspections and reinforcements have been prioritized for wooden sleeper facilities in 24 stations with frequent train operations, focusing on track sections with high accident risks. To ensure safe train operations, 125 devices to prevent track gauge widening have also been installed.


By the end of this year, all 1,609,000 wooden sleepers installed nationwide will be inspected, with approximately 16,000 aging sleepers scheduled for replacement to enhance track safety.


In the electrical equipment sector, lubrication has been completed for 67 key operating points within Seoul Station to prevent failures in track switches. Inspections of similar types of equipment that have experienced failures will also be conducted by the end of this month.


Procedures for train operations have been improved to prevent accidents during train operations. To avoid incidents such as freight train derailments and passenger trains passing without stopping, operational procedures for train stops and departures have been supplemented. Procedures have been clarified to ensure that if a stationary train unexpectedly moves, the control center is immediately notified and the safety status of surrounding tracks is checked.


Special safety training has been conducted for train operators at 51 crew service centers nationwide. The introduction of advanced technology to enhance the safety of railway vehicle organization work is also underway.


KORAIL has completed the development of rear camera technology to reduce the risks associated with existing vehicle organization work, where workers board the outside of freight cars. Plans are in place to confirm the stations where the actual system will be implemented after field verification.


The wireless control vehicle organization system has been implemented at three stations and is set to expand to a total of eight stations by 2027. This system allows workers to remotely control vehicles using wireless devices, aiming to reduce accidents caused by communication errors between workers and train operators. An AI CCTV-based worker risk prediction system is also planned for pilot implementation at Donghae Station by 2027.


Improvements to the railway work environment are being pursued concurrently. Hazardous and risky factors have been addressed at 20 locations across three stations to ensure clear pathways and visibility within vehicle organization work areas. Additionally, over 100 lighting facilities will be improved by 2028 to enhance safety during nighttime operations.


The Ministry plans to institutionalize regular on-site inspections by managers to ensure that safety measures are effectively implemented and will conduct unscheduled inspections using safety management professionals. There are also plans to encourage participation in safety management at the site through rewards for exemplary safety improvement cases.


Kim Tae-byeong, head of the Ministry's Railway Bureau, stated, "Despite various railway safety measures being implemented, the recurrence of similar accidents indicates the need to fundamentally review the on-site implementation of existing measures and the safety management system. We will strengthen the management of railway vehicles and facilities and utilize advanced technology to minimize human errors, aiming to enhance the effectiveness of accident prevention measures in collaboration with relevant agencies to establish a comprehensive railway safety enhancement plan by the end of the year."





* This article has been translated by AI.