Government Overhauls Water Management System to Address Floods and Droughts

The government is set to comprehensively improve its water management system to simultaneously respond to extreme rainfall and drought caused by the climate crisis. The plan includes expanding the flood control functions of existing dams and reservoirs, enhancing large-scale urban drainage facilities, and strengthening flood and drought prediction and management of vulnerable areas using artificial intelligence (AI).


On November 17, the Ministry of Climate, Energy, and Environment reported on the 'Water Management System Improvement Plan for the Era of Climate Crisis' during a Cabinet meeting. This plan consists of three main areas and nine tasks aimed at establishing a resilient water management system against climate change: expanding infrastructure, enhancing scientific prediction and monitoring, and managing flood and drought-prone areas and facilities.


The government's initiative to reform the water management system is driven by increasingly polarized rainfall patterns. This summer, the national rainfall totaled 558 mm, which is only 76.1% of the average. As of November 15, the water levels at the Seomjin River Dam and the Unmun Dam were significantly lower than usual, at 18.5% and 28.4%, respectively.


Conversely, in Geoje, South Gyeongsang Province, localized heavy rainfall reached a maximum of 124.5 mm per hour this year, breaking previous records.


To enhance flood control capabilities, the government plans to increase the utilization of existing water resource facilities. This year, an additional flood control capacity of 1.04 billion tons has been secured through the use of agricultural reservoirs, power generation dams, and tidal gates, with plans to identify new facilities for future use.


During flood seasons, water will be released in advance based on rainfall and river conditions to create storage space, while during drought periods, efforts will be made to maximize water storage, preparing for both floods and droughts simultaneously. The Mokgamcheon and Wonjucheon reservoirs are set to be constructed by 2029, while the small-scale flood control facility, Bonghwa Dam, is scheduled for completion by 2028. Major urban drainage facilities, including the underground rainwater tunnels at Gangnam Station and Gwanghwamun, will also be built before the 2029 flood season.


Additionally, the government is pursuing diversification of water sources to prepare for droughts. According to the Korea Meteorological Administration, this summer's national rainfall was 558.6 mm, lower than the average of 727.3 mm. This marks the third consecutive year since 2024 that summer rainfall has been below average. The number of rainy days during the summer was also 31.2 days, which is 7.3 days fewer than average. A drought warning issued by the Ministry of the Interior and Safety on November 12 indicated that the cumulative rainfall over the past six months was only 78.5% of the average.


To address this, the government plans to install an emergency water supply pipeline to send Seomjin River water to the Dongbok Dam by 2029, and to begin the basic planning for a water supply tunnel connecting the Namgang Dam and the Hapcheon Dam in 2027. The supply of recycled wastewater will also be expanded, with plans to establish a foundation to supply 330,000 tons per day to the southern Gyeonggi region and 200,000 tons per day to semiconductor industrial complexes in Honam by 2030.


AI technology will be actively utilized for flood and drought predictions. The number of flood forecasting points across the country will increase from the current 223 to 270 by 2030, and urban flood forecasts, which were piloted in six districts of Seoul this year, will be expanded to six metropolitan cities by the first half of 2030.


The number of water level observation stations in local rivers will increase from 1,023 to 1,191 by 2030, and flow measurement facilities will expand from 218 to 579. By 2028, a system will be established where AI supports decisions on dam release timing and volume using weather forecasts and river and dam water level data.


Management of vulnerable areas and aging facilities will also be strengthened. The government will prioritize maintenance for 1,073 local rivers at high risk of flooding and provide this information to local governments. The number of groundwater storage dams in islands and mountainous areas vulnerable to drought will increase from four to eight by 2030. Additionally, approximately 4,000 km of aging sewage pipes will be maintained by 2030. Safety enhancement projects, including the establishment of emergency release facilities and seismic performance improvements, will be pursued for 14 water supply dams.


Kim Han-seung, the first vice minister of climate, stated, "As rainfall patterns change rapidly due to climate change, droughts occur in one area while extreme rainfall occurs in another, leading to simultaneous occurrences of floods and droughts rather than alternating events. The current water management system, designed for past rainfall patterns, has clear limitations, so we will expand our water storage and sources, enhance prediction and monitoring, and prioritize vulnerable areas."





* This article has been translated by AI.