20th, a track switch failure occurred on the Seongsu Line of Seoul Metro Line 2, halting train operations in both directions.
According to the Seoul Transportation Corporation, from 5:37 a.m. on this day, train operations in both directions on the Seongsu Line were suspended due to a track switch failure at Yongdap Station. Some trains on Line 1 are also experiencing delays.
The Seongsu Line starts at Seongsu Station and ends at Sinseoldong Station, with a total length of 5.4 km.
This disruption was confirmed to have occurred during the process of a train violating a stop signal. As a result, the track switch was damaged. The corporation has activated an initial response team to address the issue.
* This article has been translated by AI.
Copyright ⓒ Aju Press All rights reserved.